UNDP/GEF TISZA MSP
Making space for water
in the Bodrog River Basin
(HU, SK,UA)
3nd Workshop of the UNDP/GEF Tisza MSP Project
November 13, 2009
Kosice Slovakia
GWP Slovensko
Eleonora Bartkova , project manager
Introduction to Tisza MSP
Making space for water in the Bodrog River Basin
The project implementation has been launched at the
12th Tisza Group Meeting held in Budapest, Hungary -
April 9, 2009
The main project objective:
To mitigate consequences of floods
through achieving consistent and holistic
management of flood risk in Bodrog River
catchment countries (HU-SK-UA) by creating
partnerships at national and local levels.
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Introduction to Tisza MSP
Making space for water in the Bodrog River
Basin
Baseline situation
The Bodrog River Basin area -11552km², sharedbyfour
countries (Slovakia, Ukraine , Hungary and Poland (only 0,3 km² )
Problems
·
reduced area of natural floodplain, declining biodiversity
·
water quality affected by point and dif use sources of pol ution
(agriculture, chemical production , urban ef luents)
·
insuf icient water management regarding flood prevention and
protection
·
missing harmonization of national strategies on flood management and
flood prevention within Bodrog River Basin
UNDUNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Project Component activities
Project outputs:
1. Formulation of the "Strategy for mitigation of
floods for Bodrog River Basin countries".
2. Improvement of conditions of original floodplains
and wetlands af ected by current land uses and
environmental y inappropriate flood protection
measures
3. Dissemination of project results to achieve
replication on the basin and national levels.
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Project Management
UNDP/GEF TISZA MSP
Global Water Partnership
Project management
Project partner
Project partner
Hungary
Ukraine
EKOVIZIG, VITUKI,
SWME , SHMI
Councils Baranintsi,
GWP HUNGARY
Municipalities,
Uzhgorod, Vodhoz,
Daphne
NGOs
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
1. Formulation of the "Strategy for mitigation
of floods for Bodrog River Basin countries".
Common approach based on the Tisza river basin action flood protection plans
·
National plans developed coordination
Flood risk management aims to reduce the likelihood and/or the impact of floods
incorporating the fol owing elements:
·
Prevention: preventing damage caused by floods by avoiding construction of houses
and industries in present and future flood-prone areas; by adapting future
developments to the risk of flooding; and by promoting appropriate land-use,
agricultural and forestry practices;
·
Protection: taking measures, both structural and non-structural, to reduce the
likelihood of floods and/or the impact of floods in a specific location;
·
Preparedness: informing the population about flood risks and what to do in the event
of a flood;
·
Emergency response: developing emergency response plans in the case of a flood;
·
Recovery and lessons learned: returning to normal conditions as soon as possible and
mitigating both the social and economic impacts on the af ected population.
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
1. Formulation of the "Strategy for mitigation
of floods for Bodrog River Basin countries".
Meetings with state authorities
·
The "Commit ees for transboundary waters" informed
about the Bodrog Project objectives and preparation
/formulation of the "Strategy for mitigation of floods for
Bodrog River Basin countries ,,
·
HU SK ,, Commit ee" session in September 2009 -
information was included into protocol
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
2. Improvement of conditions of original floodplains
and wetlands af ected by current land uses and
environmental y inappropriate flood protection
measures
Demonstration sites:
·Slovakia - demonstration site is located in Senné depression.
Intervention wil supply the former floodplains and/or wetlands
by water during flood events and thus wil improve natural
wetland habitats (reconstruction of existing floodgates).
·Wil ingness of farmers to cooperate is not yet confirmed
·Next steps reconstruction of flood gate located in the upstream
·Technical project developed and procurement process finished
·Continuation of negotiation with farmers
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Drainage canal system
Locations of
flood gates, which
will be
reconstructed
Slovakia - pilot demonstration site
Okna river ,,Sluice gate"
Potential area for wetland
will be reconstructed
UNDP/GEF Tisza MSP
2nd PSC, Vienna 9th December08
2. Improvement of conditions of original floodplains
and wetlands af ected by current land uses and
environmental y inappropriate flood protection
measures
Demonstration sites:
In Hungary is to improve the water supply to Tokaj-Bodrog corner
Landscape-protection District to improve the living conditions of
the protected plants and birds in the region. Site in HU is in the
main floodplain area with national protected area in its close
vicinity
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Pilot demonstration site in Hungary the Bodrog
River - Viss-Oxbow area
To build a new wooden board sluice at the 0+300 rkm
of the oxbow to retain flood water of Bodrog and thus
preventing the full emptying of the oxbow
UNDP/GEF Tisza MSP
2nd PSC, Vienna 9th December08
2. Improvement of conditions of original floodplains
and wetlands af ected by current land uses and
environmental y inappropriate flood protection
measures
Demonstration sites:
Ukraine -the improving of the Tova riverbed
conditions within the Dovge Pole vil age
according to feasibility study "Flood protection of
Tova River at the ter itory of Baranintsi vil age
council, Uzhgorod rayon.
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
. .
3. Dissemination of project results to achieve
replication on the basin and national levels
Activities:
·to inform local stakeholders on the project
activities, writing articles into the national
newspapers, preparation of a joint booklet
and its presentation to the stakeholders
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Making space for water in the Bodrog River
Basin
How the demonstration project wil assist the
Tisza Group and the development of an
Integrated River Basin Management Plan?
UNDP/GEF Tisza MSP
3nd PSC, Kosice, November 13, 2009
Making space for water in the Bodrog River
Basin
The Strategy wil be based on :
·an integrated land and water management principles,
·improving the cross-border cooperation in flood prevention, with a view
to giving "rivers more space"
·requirements of the WFD regarding achievements of environmental
objectives, Directive on Assessment and Management of flood risks
·measures:
- to reduce possible adverse ef ects of floods on infrastructure
necessary for sanitation and contaminated sites located in flood-
prone areas, especial y in case of contamination by hazardous
substances.
UNDP/GEF Tisza MSP
2nd PSC, Vienna 9th December08
Making space for water in the Bodrog River
Basin
Implementation of proposed demonstration projects:
help to answer questions regarding ef ective implementation Basin
Management Plan :
- improve natural wetland habitats (simple technical solution,
financial y feasible can be done in very short period of time - within
12 months)
- mitigation of floods
pilot demonstration activities wil serve as examples for the implementation
of new approaches in other river basins
involvement of municipalities, river basin organizations, NGOs, farmers, and
urban planning authorities